Meridian Tower

client

Galaxy Hospitality LLC

Service

budget

90K

year build

2026

DrywallCeiling Work

  • Replace damaged ceiling tiles
  • Adjust grid where necessary
  • Coordinating with MEP trades for ceiling access

Electrical

  • Remove/relocate wall devices as needed
  • Install new device covers
  • Replace or upgrade recessed lighting if required
  • Test all circuits after completion

Flooring

  • Remove existing flooring
  • Surface prep (grind/level)
  • Install new flooring finish (tile/LVP/carpet – per selection)
  • Install new base trim

7. Painting

  • Prime patched areas
  • Full repaint of walls (including curved surfaces)
  • Touch-up of trim and ceiling areas

Glass &

  • Adjust door hardware and alignment
  • Minor framing modifications (if required)
  • Patch and repair drywall surfaces
  • Prep curved wall transitions
  • Sanding & surface prep for paint

Mission and Value

Guided by Integrity. Built for the Future.

01

Decades of Proven Experience

02

Superior-Grade Materials

03

Full-Service Construction Capabilities

04

Innovative Building Practices

05

Sustainable Development Focus

06

Trusted Industry Relationships

07

Scalable Solutions for All Project Sizes